Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act Tuesday, May 21, 2024
Back

Expenditure on Muster Roll Under NREGA during the Year 2022-2023

State :KARNATAKA District : BELAGAVI
Block : SAVADATHI
Muster Roll No. date of payment Amount on UnSkilled(In Rupees)
Work Name: ಪ್ರಾಅಸ ತಡಸಲೂರ 2020-21 ನೇ ಸಾಲಿನಲ್ಲಿ ಹಲಕಿ ಅರಣ್ಯ ಸರ್ವೇ ನಂಬರ್ 252 & 253 ದಲ್ಲಿ ಕೆರೆ ನಿರ್ಮಾಣ ಮಾಡುವುದು(1504010/DP/93393042892261081)
1828 13/05/2022 6489
1828 13/05/2022 15141
1829 13/05/2022 6489
1829 13/05/2022 15141
1830 13/05/2022 4326
1830 13/05/2022 17304
1831 13/05/2022 8652
1831 13/05/2022 12978
1832 13/05/2022 12978
2496 25/05/2022 5562
2496 25/05/2022 22248
2497 25/05/2022 2781
2497 25/05/2022 19467
3262 06/06/2022 6180
3262 06/06/2022 24720
3263 06/06/2022 3090
3263 06/06/2022 21630
3264 06/06/2022 618
3264 06/06/2022 2472
3265 06/06/2022 309
3265 06/06/2022 2163
4380 14/06/2022 6180
4380 14/06/2022 24720
4381 14/06/2022 3090
4381 14/06/2022 21630
Work Name: ಪ್ರಾಅಸ ಯರಝರವಿ 2021-22 ರಲ್ಲಿ 1m ಮುಂಗಡ ಗುಂಡಿ (14x20 ಸಸಿ ನೆಡಲು) ತೋಡುವುದು(1504010/DP/93393042892304735)
8479 23/07/2022 13905
8479 23/07/2022 11124
11169 25/08/2022 18540
11170 25/08/2022 12978
12062 02/09/2022 8343
12062 02/09/2022 8343
Work Name: YARAZARVI ADVANCE PITTING WORK OF 1M3 2021-22(1504010/DP/93393042892308341)
5457 24/06/2022 12360
5457 24/06/2022 9270
5458 24/06/2022 15450
5458 24/06/2022 3090
6591 02/07/2022 15450
6591 02/07/2022 15450
6592 02/07/2022 15450
6592 02/07/2022 3090
8328 23/07/2022 21630
8328 23/07/2022 9270
8329 23/07/2022 3090
10043 05/08/2022 5562
10043 05/08/2022 3708
Work Name: ಪ್ರಾಅಸ ಬಡ್ಲಿ 2021-22 ರಲ್ಲಿ 1m ಮುಂಗಡ ಗುಂಡಿ (14x20 ಸಸಿ ನೆಡಲು) ತೋಡುವುದು(1504010/DP/93393042892308823)
1833 13/05/2022 15141
1833 13/05/2022 6489
1834 13/05/2022 12978
1834 13/05/2022 8652
1835 13/05/2022 15141
1835 13/05/2022 6489
1836 13/05/2022 6489
2498 25/05/2022 19467
2498 25/05/2022 8343
2499 25/05/2022 8343
2499 25/05/2022 19467
2500 25/05/2022 11124
2500 25/05/2022 16686
2501 25/05/2022 11124
2501 25/05/2022 16686
2502 25/05/2022 19467
2502 25/05/2022 8343
2503 25/05/2022 19467
2503 25/05/2022 2781
3266 06/06/2022 18540
3266 06/06/2022 12360
3267 06/06/2022 21630
3267 06/06/2022 9270
3268 06/06/2022 18540
3268 06/06/2022 6180
3269 06/06/2022 3090
4382 14/06/2022 15450
4382 14/06/2022 15450
4383 14/06/2022 9270
4383 14/06/2022 21630
4384 14/06/2022 18540
4384 14/06/2022 12360
4385 14/06/2022 15450
4385 14/06/2022 9270
Work Name: ಪ್ರಾಅಸ ಬಡ್ಲಿ 2021-22 ರಲ್ಲಿ 1m ಮುಂಗಡ ಗುಂಡಿ (14x20 ಸಸಿ ನೆಡಲು) ತೋಡುವುದು(1504010/DP/93393042892308824)
1837 13/05/2022 2163
1837 13/05/2022 3708
3270 06/06/2022 12360
3270 06/06/2022 18540
3271 06/06/2022 20703
3271 06/06/2022 9270
Work Name: ಪ್ರಾಅಸ ಬೆಟಸೂರ 2021-22 ರಲ್ಲಿ 1m ಮುಂಗಡ ಗುಂಡಿ (14x20 ಸಸಿ ನೆಡಲು) ತೋಡುವುದು(1504010/DP/93393042892308829)
1838 13/05/2022 12978
1838 13/05/2022 8652
1839 13/05/2022 8652
2813 25/05/2022 14832
2813 25/05/2022 8961
2814 25/05/2022 9270
3274 06/06/2022 17613
3274 06/06/2022 12051
3275 06/06/2022 12360
6610 05/07/2022 15450
6610 05/07/2022 15450
6611 05/07/2022 15450
6611 05/07/2022 9270
7661 12/07/2022 9270
7661 12/07/2022 18540
7662 12/07/2022 21630
7662 12/07/2022 3090
Work Name: ಪ್ರಾಅಸ ಗೋರಬಾಳ 2021-22 ರಲ್ಲಿ 1m ಮುಂಗಡ ಗುಂಡಿ (14x20 ಸಸಿ ನೆಡಲು) ತೋಡುವುದು(1504010/DP/93393042892308830)
3276 06/06/2022 12360
3276 06/06/2022 18540
3277 06/06/2022 18540
Work Name: ಪ್ರಾಅಸ ಹಿರೇಕುಂಬಿ 2021-22 ರಲ್ಲಿ 1m ಮುಂಗಡ ಗುಂಡಿ (14x20 ಸಸಿ ನೆಡಲು) ತೋಡುವುದು(1504010/DP/93393042892308831)
1840 13/05/2022 21630
1841 13/05/2022 21630
1842 13/05/2022 21630
1843 13/05/2022 21630
1844 13/05/2022 21630
2504 25/05/2022 27810
2505 25/05/2022 27810
2506 25/05/2022 13905
3278 06/06/2022 30900
3279 06/06/2022 27810
4386 14/06/2022 30900
4387 14/06/2022 30900
Work Name: ಪ್ರಾಅಸ ಮಬನೂರ 2021-22 ರಲ್ಲಿ 1m ಮುಂಗಡ ಗುಂಡಿ (14x20 ಸಸಿ ನೆಡಲು) ತೋಡುವುದು(1504010/DP/93393042892308832)
1845 13/05/2022 21630
1846 13/05/2022 21630
1847 13/05/2022 10815
2508 25/05/2022 27810
2509 25/05/2022 27810
2510 25/05/2022 13905
3280 06/06/2022 30900
3281 06/06/2022 30900
3282 06/06/2022 15450
4876 14/06/2022 18540
4877 14/06/2022 18540
4878 14/06/2022 18540
4879 14/06/2022 7416
6612 05/07/2022 30900
6613 05/07/2022 27810
7663 12/07/2022 30900
7664 12/07/2022 27810
11112 25/08/2022 21630
11113 25/08/2022 19467
12063 02/09/2022 27810
Work Name: ಪ್ರಾಅಸ ಉಗರಗೋಳ 2021-22 ರಲ್ಲಿ ಮಣ್ಣು ಮತ್ತು ತೇವಾಂಶ (SMC) ಸಂರಕ್ಷಣೆ ಕಾಮಗಾರಿ ಮಾಡುವುದು(1504010/DP/93393042892308837)
18928 07/12/2022 27810
18929 07/12/2022 25029
19611 19/12/2022 6180
19611 19/12/2022 24720
19612 19/12/2022 6180
19612 19/12/2022 15450
Work Name: MADAMGERI ADVANCE PITTING WORK OF 1m3 PIT DURING 2021-22(1504010/DP/93393042892309673)
5663 24/06/2022 19776
5663 24/06/2022 4944
5664 24/06/2022 22248
8330 23/07/2022 12360
8330 23/07/2022 15450
8331 23/07/2022 21630
8331 23/07/2022 9270
8332 23/07/2022 30900
8333 23/07/2022 24720
8333 23/07/2022 6180
8334 23/07/2022 6180
8334 15/09/2022 3090
13577 27/09/2022 27810
13578 27/09/2022 25029
14883 03/10/2022 24720
14884 03/10/2022 19776
14884 03/10/2022 2472
15515 15/10/2022 19467
15515 15/10/2022 8343
15516 15/10/2022 22248
16207 21/10/2022 25029
16208 21/10/2022 5562
16208 21/10/2022 22248
16209 21/10/2022 27810
16210 21/10/2022 27810
16211 21/10/2022 27810
16763 05/11/2022 16995
16763 05/11/2022 16995
16764 05/11/2022 3399
16764 05/11/2022 30591
16765 05/11/2022 3399
16765 05/11/2022 30591
16766 05/11/2022 33990
16767 05/11/2022 33990
16768 05/11/2022 6798
16768 05/11/2022 13596
17376 17/11/2022 12360
17376 17/11/2022 18540
17377 17/11/2022 30900
17378 17/11/2022 30900
17379 17/11/2022 9270
Work Name: SATTIGERI ADVANCE PITTING WORK OF 1m3 PIT DURING 2021-22(1504010/DP/93393042892309676)
2486 24/05/2022 4466
2486 24/05/2022 17864
4235 18/06/2022 10527
4235 18/06/2022 24563
4236 18/06/2022 7018
4236 18/06/2022 28072
4237 18/06/2022 24563
4237 18/06/2022 10527
4238 18/06/2022 7018
4238 18/06/2022 28072
4239 18/06/2022 35090
4240 18/06/2022 35090
4241 18/06/2022 35090
4242 18/06/2022 35090
4243 18/06/2022 35090
4244 18/06/2022 35090
4245 18/06/2022 35090
4246 18/06/2022 35090
4247 18/06/2022 7018
Work Name: SOPPADLA ADVANCE PITTING WORK OF 1m3 PIT DURING 2021-22(1504010/DP/93393042892309677)
4359 18/06/2022 15450
4359 18/06/2022 12360
4360 18/06/2022 3090
4360 18/06/2022 21630
4361 18/06/2022 27810
4362 18/06/2022 18540
4363 18/06/2022 18540
4364 18/06/2022 6180
6581 02/07/2022 15450
6581 02/07/2022 15450
6582 02/07/2022 24720
6582 02/07/2022 3090
10045 05/08/2022 21630
10046 05/08/2022 17304
13579 27/09/2022 6180
13579 27/09/2022 24720
13580 27/09/2022 18540
14903 03/10/2022 4635
14903 03/10/2022 10815
14904 03/10/2022 13905
16212 21/10/2022 27810
16213 21/10/2022 25029
16213 21/10/2022 2781
16214 21/10/2022 27810
16215 21/10/2022 5562
16876 05/11/2022 30900
16877 05/11/2022 9270
16877 05/11/2022 21630
16878 05/11/2022 30900
16879 05/11/2022 30900
16880 05/11/2022 30900
16881 05/11/2022 21630
17419 17/11/2022 6180
17419 17/11/2022 24720
17420 17/11/2022 27810
17420 17/11/2022 3090
17421 17/11/2022 30900
17422 17/11/2022 30900
17423 17/11/2022 24720
Work Name: ಪ್ರಾಅಸ ಮಲ್ಲೂರ 2021-22 ರಲ್ಲಿ 1m ಮುಂಗಡ ಗುಂಡಿ (14x20 ಸಸಿ ನೆಡಲು) ತೋಡುವುದು(1504010/DP/93393042892309998)
1848 13/05/2022 10815
1848 13/05/2022 10815
1849 13/05/2022 6489
1849 13/05/2022 12978
1850 13/05/2022 8652
1850 13/05/2022 10815
1851 13/05/2022 12978
2511 25/05/2022 13905
2511 25/05/2022 13905
2512 25/05/2022 5562
2512 25/05/2022 16686
2513 25/05/2022 11124
2513 25/05/2022 13905
2514 25/05/2022 2781
2514 25/05/2022 16686
2515 25/05/2022 16686
2515 25/05/2022 11124
2516 25/05/2022 5562
2516 25/05/2022 5562
3283 06/06/2022 15450
3283 06/06/2022 15450
3284 06/06/2022 9270
3284 06/06/2022 18540
Work Name: (AD) AKKISAGAR ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310065)
3242 31/05/2022 22330
3242 31/05/2022 9570
3243 31/05/2022 28710
5461 24/06/2022 27810
5461 24/06/2022 3090
5462 24/06/2022 27810
6593 02/07/2022 27810
6593 02/07/2022 3090
6594 02/07/2022 27810
7759 14/07/2022 25029
7759 14/07/2022 2781
7760 14/07/2022 27810
7761 14/07/2022 19467
8336 23/07/2022 30900
8337 23/07/2022 30900
8338 23/07/2022 30900
8339 23/07/2022 12360
13958 27/09/2022 19776
13958 27/09/2022 4944
13959 27/09/2022 24720
13960 27/09/2022 19776
14614 03/10/2022 27810
14615 03/10/2022 27810
16216 21/10/2022 11124
16216 21/10/2022 11124
16217 21/10/2022 19467
16218 21/10/2022 22248
16219 21/10/2022 13905
16220 21/10/2022 8343
17304 17/11/2022 18540
17304 17/11/2022 12360
17305 17/11/2022 30900
17306 17/11/2022 27810
17306 17/11/2022 3090
17307 17/11/2022 3090
18571 03/12/2022 21630
18571 03/12/2022 9270
18572 03/12/2022 12360
18572 03/12/2022 18540
18573 03/12/2022 30900
18574 03/12/2022 30900
18575 03/12/2022 30900
18576 03/12/2022 3090
18576 03/12/2022 6180
Work Name: (AD) 2 AKKISAGAR ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310066)
9429 05/08/2022 30591
9429 05/08/2022 3399
9430 05/08/2022 30591
9430 05/08/2022 3399
9431 05/08/2022 33990
9432 05/08/2022 27192
10513 13/08/2022 24720
10513 13/08/2022 6180
10514 13/08/2022 30900
10515 13/08/2022 27810
11323 21/08/2022 5562
11323 21/08/2022 22248
11324 21/08/2022 27810
11325 21/08/2022 25029
12058 04/09/2022 6798
12058 04/09/2022 27192
12059 04/09/2022 33990
12060 04/09/2022 33990
12061 04/09/2022 6798
12862 12/09/2022 27810
12862 12/09/2022 3090
12863 12/09/2022 30900
12864 12/09/2022 12360
13961 27/09/2022 19776
13961 27/09/2022 4944
13962 27/09/2022 24720
13963 27/09/2022 12360
14616 03/10/2022 25029
14616 03/10/2022 2781
14617 03/10/2022 19467
16221 21/10/2022 25029
16221 21/10/2022 2781
16222 21/10/2022 11124
16882 05/11/2022 3090
16882 05/11/2022 15450
18795 03/12/2022 12360
18795 03/12/2022 12360
18796 03/12/2022 24720
18797 03/12/2022 24720
19522 17/12/2022 8343
19522 17/12/2022 19467
19523 17/12/2022 8343
19523 17/12/2022 11124
Work Name: (AD) KADABI ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310069)
2487 24/05/2022 13398
2487 24/05/2022 6699
2487 02/07/2022 2233
2488 24/05/2022 20097
3244 31/05/2022 9570
3244 31/05/2022 19140
3244 23/07/2022 3190
3245 31/05/2022 28710
3540 31/05/2022 20416
3540 31/05/2022 5104
3541 31/05/2022 22968
3541 31/05/2022 2552
3542 31/05/2022 10208
3542 31/05/2022 10208
4195 18/06/2022 14026
4195 18/06/2022 17545
4195 23/07/2022 3509
4196 18/06/2022 28072
4196 18/06/2022 7018
4197 18/06/2022 35090
4198 18/06/2022 17545
4198 18/06/2022 17545
4199 18/06/2022 10527
5459 24/06/2022 15450
5459 24/06/2022 12360
5459 23/07/2022 3090
5460 24/06/2022 24720
5460 24/06/2022 3090
6595 02/07/2022 15450
6595 02/07/2022 15450
6596 02/07/2022 27810
7519 14/07/2022 21630
7519 14/07/2022 9270
7520 14/07/2022 26265
Work Name: (AD) MADAMAGERI ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310071)
2489 24/05/2022 13398
2489 24/05/2022 8932
4248 18/06/2022 14036
4248 18/06/2022 21054
4249 18/06/2022 21054
4249 18/06/2022 14036
4250 18/06/2022 35090
4251 18/06/2022 35090
4252 18/06/2022 7018
5463 24/06/2022 12360
5463 24/06/2022 18540
5464 24/06/2022 18540
5464 24/06/2022 12360
5465 24/06/2022 30900
5466 24/06/2022 30900
5467 24/06/2022 3090
7586 14/07/2022 12360
7586 14/07/2022 18540
7587 14/07/2022 21630
7587 14/07/2022 9270
7588 14/07/2022 30900
7589 14/07/2022 24720
7589 14/07/2022 6180
7590 14/07/2022 27810
7590 14/07/2022 3090
7591 14/07/2022 12360
8340 23/07/2022 27810
8340 23/07/2022 3090
8341 23/07/2022 24720
15517 15/10/2022 16686
15517 15/10/2022 11124
15518 15/10/2022 25029
Work Name: (AD) 2 MADAMAGERI ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310074)
11349 25/08/2022 17304
11349 25/08/2022 7416
11950 04/09/2022 33990
11951 04/09/2022 30591
11951 04/09/2022 3399
11952 04/09/2022 6798
11952 04/09/2022 27192
11953 04/09/2022 30591
11954 04/09/2022 33990
13581 27/09/2022 13905
13581 27/09/2022 13905
13582 27/09/2022 19467
14881 03/10/2022 12360
14881 03/10/2022 12360
14882 03/10/2022 9888
14882 03/10/2022 12360
15523 15/10/2022 8343
15523 15/10/2022 2781
16223 21/10/2022 11124
16223 21/10/2022 16686
16224 21/10/2022 22248
16224 21/10/2022 5562
16225 21/10/2022 25029
16225 21/10/2022 2781
16226 21/10/2022 22248
16226 21/10/2022 5562
16227 21/10/2022 16686
17411 17/11/2022 30900
17412 17/11/2022 12360
17412 17/11/2022 15450
18568 03/12/2022 24720
18568 03/12/2022 6180
18569 03/12/2022 27810
18569 03/12/2022 3090
18570 03/12/2022 24720
18570 03/12/2022 3090
Work Name: (AD) 3 MADAMAGERI ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310081)
11070 25/08/2022 15450
11070 25/08/2022 15450
11071 25/08/2022 18540
11071 25/08/2022 3090
11374 25/08/2022 12360
11374 25/08/2022 12360
11375 25/08/2022 4944
11375 25/08/2022 19776
11376 25/08/2022 24720
11377 25/08/2022 24720
11378 25/08/2022 24720
11379 25/08/2022 24720
11946 04/09/2022 33990
11947 04/09/2022 3399
11947 04/09/2022 30591
11948 04/09/2022 23793
11948 04/09/2022 3399
13583 27/09/2022 24720
13583 27/09/2022 6180
13584 27/09/2022 6180
14879 03/10/2022 22248
14879 03/10/2022 2472
14880 03/10/2022 22248
15519 15/10/2022 27810
15520 15/10/2022 25029
17424 17/11/2022 27810
17424 17/11/2022 3090
17425 17/11/2022 30900
17426 17/11/2022 9270
Work Name: (AD) MUGALIHAL ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310084)
7863 14/07/2022 10815
7889 14/07/2022 4326
8471 23/07/2022 27810
8471 23/07/2022 3090
8472 23/07/2022 24720
15521 15/10/2022 27810
15522 15/10/2022 11124
15522 15/10/2022 8343
18026 24/11/2022 30900
18027 24/11/2022 18540
18027 24/11/2022 12360
18028 24/11/2022 3090
20620 27/12/2022 12978
20620 27/12/2022 5562
20621 27/12/2022 11124
20621 27/12/2022 7416
20622 27/12/2022 14832
20622 27/12/2022 3708
20623 27/12/2022 9270
20623 27/12/2022 9270
20624 27/12/2022 12978
20624 27/12/2022 5562
20625 27/12/2022 12978
20625 27/12/2022 5562
20626 27/12/2022 7416
20626 27/12/2022 11124
20627 27/12/2022 12978
20627 27/12/2022 5562
Work Name: (AD) 2 MUGALIHAL ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310085)
9671 05/08/2022 21321
9672 05/08/2022 15450
9673 05/08/2022 11124
9674 05/08/2022 16686
9675 05/08/2022 15759
9676 05/08/2022 15141
9677 05/08/2022 16995
9678 05/08/2022 18231
9679 05/08/2022 15141
9679 05/08/2022 4326
9680 05/08/2022 12978
9680 05/08/2022 4326
9681 05/08/2022 14523
9681 05/08/2022 2163
9682 05/08/2022 12978
9683 05/08/2022 12051
9684 05/08/2022 14523
9684 05/08/2022 4017
9685 05/08/2022 17304
9686 05/08/2022 17304
9687 05/08/2022 5871
9687 05/08/2022 4017
11767 02/09/2022 11124
11768 02/09/2022 11124
11769 02/09/2022 12669
11770 02/09/2022 12051
11771 02/09/2022 13596
11772 02/09/2022 6798
11773 02/09/2022 6489
11774 02/09/2022 12051
11775 02/09/2022 14832
11776 02/09/2022 13596
11777 02/09/2022 3708
11777 02/09/2022 618
11778 02/09/2022 4326
11778 02/09/2022 3090
11779 02/09/2022 6798
11780 02/09/2022 5562
11781 02/09/2022 12978
11781 02/09/2022 309
11782 02/09/2022 6180
15524 15/10/2022 27810
15525 15/10/2022 25029
18798 03/12/2022 24720
18799 03/12/2022 24720
18800 03/12/2022 24720
18801 03/12/2022 19776
18801 03/12/2022 4944
18802 03/12/2022 21630
18802 03/12/2022 2472
18803 03/12/2022 4944
Work Name: (AD) SATTIGERI ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310089)
4253 18/06/2022 33990
4254 18/06/2022 16995
4254 18/06/2022 16995
4255 18/06/2022 20394
4255 18/06/2022 6798
10632 13/08/2022 2781
10632 13/08/2022 25029
Work Name: (AD) 3 SATTIGERI ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310092)
4365 18/06/2022 6380
4365 18/06/2022 25520
4366 18/06/2022 28710
4366 18/06/2022 3190
4367 18/06/2022 19140
4367 18/06/2022 12760
4368 18/06/2022 30900
4369 18/06/2022 12760
4369 18/06/2022 19140
4370 18/06/2022 24720
4370 18/06/2022 3090
4370 03/10/2022 3090
4371 18/06/2022 9270
5468 24/06/2022 9270
5468 24/06/2022 21630
5469 24/06/2022 6180
5469 24/06/2022 24720
5470 24/06/2022 21630
5470 24/06/2022 9270
5471 24/06/2022 6180
5471 24/06/2022 24720
5472 24/06/2022 30900
5473 24/06/2022 30900
5474 24/06/2022 30900
5475 24/06/2022 30900
5476 24/06/2022 27810
5477 24/06/2022 30900
5478 24/06/2022 30900
5479 24/06/2022 30900
5480 24/06/2022 28119
5481 24/06/2022 18540
5481 24/06/2022 12360
5482 24/06/2022 9270
5482 24/06/2022 18849
6585 02/07/2022 18540
6585 02/07/2022 12360
6586 02/07/2022 21630
6586 02/07/2022 6180
9449 05/08/2022 10197
9449 05/08/2022 23793
9450 05/08/2022 6798
9450 05/08/2022 27192
9451 05/08/2022 16995
9451 05/08/2022 16995
9452 05/08/2022 13596
9452 05/08/2022 20394
9453 05/08/2022 3399
9453 05/08/2022 30591
10517 13/08/2022 3090
10517 13/08/2022 21630
Work Name: (AD) 4 SATTIGERI ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310093)
6587 02/07/2022 9270
6587 02/07/2022 21630
6588 02/07/2022 27810
7521 14/07/2022 6180
7521 14/07/2022 24720
7522 14/07/2022 6180
7522 14/07/2022 23793
7523 14/07/2022 21630
7523 14/07/2022 9270
7524 14/07/2022 30900
7525 14/07/2022 30900
7526 14/07/2022 30900
7527 14/07/2022 30900
7528 14/07/2022 15450
8342 23/07/2022 24720
8342 23/07/2022 6180
8343 23/07/2022 30900
8344 23/07/2022 30900
8345 23/07/2022 30900
8346 23/07/2022 30900
8347 23/07/2022 30900
8348 23/07/2022 30900
8349 23/07/2022 15450
9440 05/08/2022 23793
9440 05/08/2022 10197
9441 05/08/2022 33990
9442 05/08/2022 33990
9443 05/08/2022 33990
9444 05/08/2022 33990
9445 05/08/2022 33990
9446 05/08/2022 20394
10518 13/08/2022 27810
10518 13/08/2022 3090
10519 13/08/2022 24720
10519 13/08/2022 3090
11136 21/08/2022 6180
11136 21/08/2022 24720
11137 21/08/2022 27810
Work Name: (AD) 5 SATTIGERI ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310094)
8732 23/07/2022 19776
8732 23/07/2022 4944
8733 23/07/2022 24720
8734 23/07/2022 24720
8735 23/07/2022 24720
8736 23/07/2022 24720
8737 23/07/2022 24720
8738 23/07/2022 24720
8739 23/07/2022 2472
8739 23/07/2022 2472
9272 05/08/2022 24720
9272 05/08/2022 6180
9273 05/08/2022 30900
9274 05/08/2022 21630
9274 05/08/2022 9270
9275 05/08/2022 30900
9276 05/08/2022 30900
9277 05/08/2022 6180
9278 05/08/2022 6180
9279 05/08/2022 6180
9280 05/08/2022 6180
9281 05/08/2022 1854
9281 05/08/2022 1236
10520 13/08/2022 24720
10520 13/08/2022 6180
10521 13/08/2022 30900
10522 13/08/2022 21630
10522 13/08/2022 9270
10523 13/08/2022 30900
12865 12/09/2022 18540
12865 12/09/2022 12360
12866 12/09/2022 30900
12867 12/09/2022 30900
12868 12/09/2022 30900
12869 12/09/2022 30900
12870 12/09/2022 27810
12870 12/09/2022 3090
12871 12/09/2022 6180
12871 12/09/2022 24720
12872 12/09/2022 3090
18566 03/12/2022 24720
18566 03/12/2022 6180
18567 03/12/2022 27810
Work Name: SATTIGERI 1 SMC (PERCOLATION TRENCHES) WORK 2021-22(1504010/DP/93393042892310108)
8350 23/07/2022 9270
8350 23/07/2022 21630
8351 23/07/2022 15450
8351 23/07/2022 15450
8352 23/07/2022 3090
8352 23/07/2022 27810
8353 23/07/2022 3090
8353 23/07/2022 27810
8354 23/07/2022 30900
8355 23/07/2022 3090
8355 23/07/2022 6180
Work Name: (AD) SOPPADLA ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310113)
5483 24/06/2022 30900
5484 24/06/2022 15450
6583 02/07/2022 30900
6584 02/07/2022 27810
7864 14/07/2022 10815
7864 14/07/2022 10815
7865 14/07/2022 19467
7865 14/07/2022 2163
7866 14/07/2022 21630
7867 14/07/2022 15141
7868 14/07/2022 21630
7869 14/07/2022 2163
8356 23/07/2022 15450
8356 23/07/2022 12360
8357 23/07/2022 21630
8357 23/07/2022 3090
8358 23/07/2022 30900
8359 23/07/2022 15450
8360 23/07/2022 24720
10048 05/08/2022 10815
10048 05/08/2022 10815
10049 05/08/2022 19467
10633 13/08/2022 11124
10633 13/08/2022 16686
10634 13/08/2022 25029
11057 21/08/2022 12360
11057 21/08/2022 18540
11058 21/08/2022 18540
14905 03/10/2022 9270
14905 03/10/2022 6180
14906 03/10/2022 13905
18804 03/12/2022 7416
18804 03/12/2022 17304
18805 03/12/2022 24720
18806 03/12/2022 19776
Work Name: (AD) TALLUR ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310116)
2490 24/05/2022 13398
2490 24/05/2022 8932
2491 24/05/2022 11165
2491 24/05/2022 8932
3246 31/05/2022 12760
3246 31/05/2022 19140
3247 31/05/2022 12760
3247 31/05/2022 15950
3435 31/05/2022 8613
3435 31/05/2022 20097
3436 31/05/2022 5742
4200 18/06/2022 14036
4200 18/06/2022 21054
4201 18/06/2022 7018
4201 18/06/2022 28072
4202 18/06/2022 21054
4202 18/06/2022 14036
4203 18/06/2022 7018
5485 24/06/2022 12360
5485 24/06/2022 18540
5486 24/06/2022 6180
5486 24/06/2022 21630
6597 02/07/2022 15450
6597 02/07/2022 15450
6598 02/07/2022 9270
6598 02/07/2022 15450
6598 10/08/2022 3090
7529 14/07/2022 9270
7529 14/07/2022 21630
7530 14/07/2022 12360
7530 14/07/2022 15450
8362 23/07/2022 6180
8362 23/07/2022 24720
8363 23/07/2022 24720
8363 15/09/2022 3090
9925 05/08/2022 3708
9925 05/08/2022 14832
9926 05/08/2022 11124
9926 05/08/2022 1854
9926 15/09/2022 1854
10525 13/08/2022 9270
10525 13/08/2022 21630
10526 13/08/2022 9270
10526 13/08/2022 18540
11059 28/08/2022 18540
11059 28/08/2022 12360
11060 28/08/2022 3090
11060 28/08/2022 21630
12040 02/09/2022 15450
12040 02/09/2022 15450
12041 02/09/2022 18540
12041 02/09/2022 6180
Work Name: (AD) 2 TALLUR ADVANCE PITING WORK OF 1m3 BLOCK 2021-22(1504010/DP/93393042892310118)
6798 02/07/2022 9888
6798 02/07/2022 14832
6799 02/07/2022 7416
6799 02/07/2022 2472
7533 14/07/2022 21630
7533 14/07/2022 9270
7534 14/07/2022 18540
7534 14/07/2022 3090
8364 23/07/2022 18540
8364 23/07/2022 12360
8365 23/07/2022 15450
8365 23/07/2022 9270
8392 23/07/2022 15450
8392 23/07/2022 6180
8615 23/07/2022 19467
8615 23/07/2022 8343
8616 23/07/2022 11124
9669 08/08/2022 12360
9669 08/08/2022 18540
9670 08/08/2022 18540
10527 13/08/2022 21630
10527 13/08/2022 9270
10528 13/08/2022 6180
Work Name: ಪ್ರಾಅಸ ಮಲ್ಲೂರ 2021-22 ರಲ್ಲಿ 1m ಮುಂಗಡ ಗುಂಡಿ (14x20 ಸಸಿ ನೆಡಲು) ತೋಡುವುದು(1504010/DP/93393042892310238)
3285 06/06/2022 12360
3285 06/06/2022 15450
3286 06/06/2022 3090
3286 06/06/2022 18540
3287 06/06/2022 21630
3287 06/06/2022 9270
3288 06/06/2022 3090
4388 14/06/2022 12360
4388 14/06/2022 15450
4389 14/06/2022 12360
4389 14/06/2022 15450
4390 14/06/2022 9270
4390 14/06/2022 18540
4391 14/06/2022 21630
4391 14/06/2022 9270
4392 14/06/2022 3090
4392 14/06/2022 21630
4393 14/06/2022 24720
4393 14/06/2022 3090
5498 23/06/2022 12360
5498 23/06/2022 15450
5499 23/06/2022 12360
5499 23/06/2022 12360
6710 05/07/2022 8343
6710 05/07/2022 13905
6711 05/07/2022 8343
6711 05/07/2022 5562
7665 12/07/2022 9270
7665 12/07/2022 18540
7666 12/07/2022 15450
7666 12/07/2022 12360
7667 12/07/2022 15450
7667 12/07/2022 9270
8318 23/07/2022 9270
8318 23/07/2022 3090
Work Name: ಪ್ರಾಅಸ ಮಲ್ಲೂರ 2021-22 ರಲ್ಲಿ ಮಣ್ಣು ಮತ್ತು ತೇವಾಂಶ (SMC) ಸಂರಕ್ಷಣೆ ಕಾಮಗಾರಿ ಮಾಡುವುದು(1504010/DP/93393042892310240)
12138 02/09/2022 13905
12138 02/09/2022 13905
12139 02/09/2022 16686
12139 02/09/2022 5562
12899 12/09/2022 13905
12899 12/09/2022 13905
12900 12/09/2022 13905
12900 12/09/2022 5562
13723 23/09/2022 13905
13723 23/09/2022 13905
13724 23/09/2022 13905
13724 23/09/2022 5562
15281 13/10/2022 18540
15281 13/10/2022 12360
15282 13/10/2022 12360
15282 13/10/2022 3090
16802 07/11/2022 16686
16802 07/11/2022 11124
16803 07/11/2022 2781
18930 07/12/2022 8343
18930 07/12/2022 19467
18931 07/12/2022 5562
18931 07/12/2022 8343
19613 19/12/2022 6180
19613 19/12/2022 24720
19614 19/12/2022 9270
Work Name: ಪ್ರಾಅಸ ಮಲ್ಲೂರ 2021-22 ರಲ್ಲಿ ಮಣ್ಣು ಮತ್ತು ತೇವಾಂಶ (SMC) ಸಂರಕ್ಷಣೆ ಕಾಮಗಾರಿ ಮಾಡುವುದು(1504010/DP/93393042892310241)
1852 13/05/2022 8652
1852 13/05/2022 8652
1853 13/05/2022 4326
1853 13/05/2022 4326
5500 23/06/2022 9270
5500 23/06/2022 18540
5501 23/06/2022 21630
5501 23/06/2022 6180
6712 05/07/2022 8343
6712 05/07/2022 11124
Work Name: ಪ್ರಾಅಸ ಯಕ್ಕುಂಡಿ 2021-22 ರಲ್ಲಿ 1m ಮುಂಗಡ ಗುಂಡಿ (14x20 ಸಸಿ ನೆಡಲು) ತೋಡುವುದು(1504010/DP/93393042892311490)
1854 13/05/2022 6489
1854 13/05/2022 15141
1855 13/05/2022 8652
1855 13/05/2022 12978
1856 13/05/2022 19467
1857 13/05/2022 2163
2517 25/05/2022 8343
2517 25/05/2022 19467
2518 25/05/2022 11124
2518 25/05/2022 16686
2519 25/05/2022 25029
2520 25/05/2022 13905
2520 25/05/2022 13905
2521 25/05/2022 27810
2522 25/05/2022 16686
3289 06/06/2022 9270
3289 06/06/2022 21630
3290 06/06/2022 12360
3290 06/06/2022 18540
3291 06/06/2022 27810
3292 06/06/2022 15450
3292 06/06/2022 15450
3293 06/06/2022 30900
3294 06/06/2022 15450
4394 14/06/2022 15450
Work Name: ಪ್ರಾಅಸ ಯಕ್ಕುಂಡಿ 2021-22 ರಲ್ಲಿ 1m ಮುಂಗಡ ಗುಂಡಿ (14x20 ಸಸಿ ನೆಡಲು) ತೋಡುವುದು(1504010/DP/93393042892311491)
1858 13/05/2022 15141
1858 13/05/2022 6489
1859 13/05/2022 12978
1859 13/05/2022 8652
1860 13/05/2022 8652
1860 13/05/2022 8652
1861 13/05/2022 10815
1861 13/05/2022 6489
2524 25/05/2022 19467
2524 25/05/2022 8343
2525 25/05/2022 16686
2525 25/05/2022 11124
2526 25/05/2022 11124
2526 25/05/2022 11124
2527 25/05/2022 13905
2527 25/05/2022 8343
3295 06/06/2022 18540
3295 06/06/2022 6180
3296 06/06/2022 18540
3296 06/06/2022 12360
3297 06/06/2022 9270
3297 06/06/2022 12360
3298 06/06/2022 15450
3298 06/06/2022 9270
3299 06/06/2022 3090
4395 14/06/2022 12360
4395 14/06/2022 9270
4396 14/06/2022 18540
4396 14/06/2022 12360
4397 14/06/2022 15450
4397 14/06/2022 12360
4398 14/06/2022 15450
4398 14/06/2022 9270
4399 14/06/2022 15450
Work Name: ಪ್ರಾಅಸ ಯಕ್ಕುಂಡಿ 2021-22 ರಲ್ಲಿ ಮಣ್ಣು ಮತ್ತು ತೇವಾಂಶ (SMC) ಸಂರಕ್ಷಣೆ ಕಾಮಗಾರಿ ಮಾಡುವುದು(1504010/DP/93393042892311492)
5530 23/06/2022 9270
5530 23/06/2022 21630
5531 23/06/2022 9270
5531 23/06/2022 15450
6714 05/07/2022 5562
6714 05/07/2022 16686
6715 05/07/2022 19467
7668 12/07/2022 9270
7668 12/07/2022 9270
7669 12/07/2022 15450
7669 12/07/2022 3090
8319 23/07/2022 18540
8319 23/07/2022 9270
11191 25/08/2022 11124
11191 25/08/2022 3708
11192 25/08/2022 3708
11192 25/08/2022 12978
13727 23/09/2022 25029
13727 23/09/2022 2781
13728 23/09/2022 13905
15283 13/10/2022 24720
15283 13/10/2022 3090
15284 13/10/2022 15450
16804 07/11/2022 27810
16805 07/11/2022 2781
Work Name: ಪ್ರಾಅಸ ಯಕ್ಕುಂಡಿ 2021-22 ರಲ್ಲಿ ಮಣ್ಣು ಮತ್ತು ತೇವಾಂಶ (SMC) ಸಂರಕ್ಷಣೆ ಕಾಮಗಾರಿ ಮಾಡುವುದು(1504010/DP/93393042892311493)
1862 13/05/2022 19467
1863 13/05/2022 2163
5532 23/06/2022 12360
5532 23/06/2022 3090
5533 23/06/2022 12360
5533 23/06/2022 15450
6716 05/07/2022 13905
6716 05/07/2022 5562
6717 05/07/2022 5562
7670 12/07/2022 6180
7670 12/07/2022 24720
7671 12/07/2022 24720
8320 23/07/2022 9270
8320 23/07/2022 21630
8321 23/07/2022 3090
11204 25/08/2022 9270
11204 25/08/2022 9270
11205 25/08/2022 1854
11205 25/08/2022 5562
12140 02/09/2022 11124
12140 02/09/2022 11124
12141 02/09/2022 8343
12141 02/09/2022 2781
12901 12/09/2022 5562
12901 12/09/2022 2781
Work Name: ಪ್ರಾಅಸ ಬಡ್ಲಿ 2021-22 ರಲ್ಲಿ ಮಣ್ಣು ಮತ್ತು ತೇವಾಂಶ (SMC) ಸಂರಕ್ಷಣೆ ಕಾಮಗಾರಿ ಮಾಡುವುದು(1504010/DP/93393042892311898)
1864 13/05/2022 6489
1864 13/05/2022 15141
1865 13/05/2022 6489
1865 13/05/2022 15141
1866 13/05/2022 17304
1866 13/05/2022 4326
1867 13/05/2022 4326
5534 23/06/2022 15450
5534 23/06/2022 15450
5535 23/06/2022 18540
5535 23/06/2022 9270
8322 23/07/2022 12360
8322 23/07/2022 18540
8323 23/07/2022 12360
8323 23/07/2022 15450
10740 13/08/2022 4944
10740 13/08/2022 19776
10741 13/08/2022 22248
11202 25/08/2022 3708
11202 25/08/2022 14832
11203 25/08/2022 14832
12142 02/09/2022 2781
12142 02/09/2022 5253
Work Name: ಪ್ರಾಅಸ ಬಡ್ಲಿ 2021-22 ರಲ್ಲಿ ಮಣ್ಣು ಮತ್ತು ತೇವಾಂಶ (SMC) ಸಂರಕ್ಷಣೆ ಕಾಮಗಾರಿ ಮಾಡುವುದು(1504010/DP/93393042892311899)
12143 02/09/2022 2781
12143 02/09/2022 19467
12144 02/09/2022 2781
12144 02/09/2022 5562
12902 12/09/2022 2781
12903 12/09/2022 5562
12903 12/09/2022 8343
13729 23/09/2022 13905
13729 23/09/2022 13905
13730 23/09/2022 5562
14764 07/10/2022 9888
14764 07/10/2022 9888
15285 13/10/2022 6180
15285 13/10/2022 12360
16806 07/11/2022 2781
16806 07/11/2022 8343
18932 07/12/2022 11124
18932 07/12/2022 2781
19615 19/12/2022 3090
19615 19/12/2022 9270
21247 10/01/2023 8343
Work Name: AD BEDASUR ADVANCE PITTING WORK OF 1M3 2021-22(1504010/DP/93393042892312159)
3248 31/05/2022 6380
3248 31/05/2022 24244
3249 31/05/2022 22330
3249 31/05/2022 3828
3437 31/05/2022 13717
3437 31/05/2022 14355
3438 31/05/2022 2871
3438 31/05/2022 7975
4205 18/06/2022 4147
4205 18/06/2022 10527
4206 18/06/2022 7018
5487 24/06/2022 21630
5487 24/06/2022 3090
5488 24/06/2022 3090
5488 24/06/2022 24720
Work Name: AD TADASALUR (BLOCK) 1 ADVANCE PITTING WORK OF 1M3 2021-22(1504010/DP/93393042892312168)
2483 24/05/2022 20097
2483 24/05/2022 2233
2484 24/05/2022 4466
2484 24/05/2022 15631
3250 31/05/2022 2871
3250 31/05/2022 25839
3251 31/05/2022 20097
3251 31/05/2022 5742
4207 10/06/2022 3509
4207 10/06/2022 31581
4208 10/06/2022 21054
4208 10/06/2022 7018
5489 24/06/2022 3090
5489 24/06/2022 27810
5490 24/06/2022 21630
5490 24/06/2022 6180
6601 02/07/2022 27810
6602 02/07/2022 24411
6602 02/07/2022 3090
7827 14/07/2022 2781
7827 14/07/2022 25029
7828 14/07/2022 13905
7828 14/07/2022 2781
8366 23/07/2022 30900
8367 23/07/2022 27810
Work Name: AD TADASALUR (BLOCK) 2 ADVANCE PITTING WORK OF 1M3 2021-22(1504010/DP/93393042892312170)
2485 24/05/2022 11165
2485 24/05/2022 8932
3252 31/05/2022 11484
3252 31/05/2022 14355
4209 10/06/2022 13596
4209 10/06/2022 13596
5491 24/06/2022 9270
5491 24/06/2022 18540
6603 02/07/2022 3090
6603 02/07/2022 27810
7829 14/07/2022 2781
7829 14/07/2022 16686
8368 23/07/2022 3090
8368 23/07/2022 27501
8369 23/07/2022 6180
8369 23/07/2022 24720
8370 23/07/2022 21630
8370 23/07/2022 9270
Work Name: Advance Pitting Work of 1M3 Pit at Tadasalur GP During 2021-22 WS(1504010/DP/93393042892312604)
12816 19/09/2022 17304
12816 19/09/2022 25956
12817 19/09/2022 4326
14279 01/10/2022 43260
15389 14/10/2022 21630
15389 14/10/2022 21630
15390 14/10/2022 12978
Work Name: Advance Pitting Work of 1M3 Pit at Chachadi GP During 2021-22 P-I WS(1504010/DP/93393042892312605)
5453 29/06/2022 43260
5454 29/06/2022 17304
7271 16/07/2022 38934
7271 14/10/2022 4326
7272 16/07/2022 12978
7272 16/07/2022 4326
8870 03/08/2022 30282
8870 03/08/2022 12978
8871 03/08/2022 25956
8871 03/08/2022 8652
8871 14/10/2022 4326
10603 16/08/2022 21630
10603 16/08/2022 21630
10604 16/08/2022 12978
10604 16/08/2022 17304
11507 02/09/2022 25956
11507 02/09/2022 17304
11508 02/09/2022 17304
11508 02/09/2022 21630
12820 19/09/2022 20394
12820 19/09/2022 21630
12821 19/09/2022 12978
12821 19/09/2022 21630
19318 17/12/2022 8652
19318 17/12/2022 30282
20497 30/12/2022 8652
20497 30/12/2022 34608
20498 30/12/2022 4326
20498 30/12/2022 21630
21431 16/01/2023 16068
21431 16/01/2023 24102
Work Name: Advance Pitting Work of 1M3 Pit at Chachadi GP During 2021-22 P-II WS(1504010/DP/93393042892312606)
7273 16/07/2022 34608
7273 16/07/2022 8652
8872 03/08/2022 30282
8872 03/08/2022 12978
8873 03/08/2022 25956
8873 03/08/2022 8652
11409 02/09/2022 4326
11409 02/09/2022 38934
11410 02/09/2022 8652
17461 17/11/2022 8652
17461 17/11/2022 34608
17462 17/11/2022 25956
17462 17/11/2022 12978
18208 03/12/2022 12978
18208 03/12/2022 30282
18209 03/12/2022 8652
20499 30/12/2022 17304
20499 30/12/2022 25956
20500 30/12/2022 17304
20500 30/12/2022 12978
21432 16/01/2023 24102
21432 16/01/2023 16068
21433 16/01/2023 12051
Work Name: Advance Pitting Work of 1M3 pit at Tadasalur GP During 2021-22 P-2 (WS)(1504010/DP/93393042892312936)
6192 01/07/2022 12978
6192 01/07/2022 30282
6193 01/07/2022 8652
6193 01/07/2022 25956
7501 16/07/2022 17304
7501 16/07/2022 25956
7502 16/07/2022 12978
7502 16/07/2022 21630
10605 16/08/2022 4326
10605 16/08/2022 38934
10606 16/08/2022 34608
11509 02/09/2022 34608
11510 02/09/2022 12978
11510 02/09/2022 12978
Work Name: Advance Pitting Work of 1M3 pit at Yarzarvi GP During 2021-22 (WS)(1504010/DP/93393042892312939)
5455 29/06/2022 25956
5455 29/06/2022 17304
5456 29/06/2022 4326
5456 29/06/2022 34608
7274 16/07/2022 17304
7274 16/07/2022 25956
7275 16/07/2022 38934
8874 03/08/2022 25956
8874 03/08/2022 17304
8875 03/08/2022 38934
8875 03/08/2022 4326
8876 03/08/2022 4326
8876 03/08/2022 38934
8877 03/08/2022 12978
8877 03/08/2022 8652
10702 19/08/2022 30282
10702 19/08/2022 12978
10703 19/08/2022 16686
10703 19/08/2022 4326
11532 02/09/2022 21630
11532 02/09/2022 21630
11533 02/09/2022 4326
11533 02/09/2022 21630
12822 19/09/2022 21630
12822 19/09/2022 17304
Work Name: ADVANCE PITTING WORK OF 1M3 2021-22(1504010/DP/93393042892314217)
4400 14/06/2022 18540
4400 14/06/2022 12360
4401 14/06/2022 18540
4401 14/06/2022 9270
5536 23/06/2022 18540
5536 23/06/2022 12360
5537 23/06/2022 18540
5537 23/06/2022 9270
6718 05/07/2022 19467
6718 05/07/2022 8343
6719 05/07/2022 2781
6719 05/07/2022 25029
6720 05/07/2022 16686
6720 05/07/2022 8343
6721 05/07/2022 16686
6721 05/07/2022 11124
6722 05/07/2022 13905
6722 05/07/2022 5562
7672 12/07/2022 12360
7672 12/07/2022 18540
7673 12/07/2022 21630
7673 12/07/2022 9270
7674 12/07/2022 9270
8324 23/07/2022 6180
8324 23/07/2022 21630
8325 23/07/2022 9270
8325 23/07/2022 21630
8326 23/07/2022 24720
8326 23/07/2022 6180
8327 23/07/2022 3090
11200 25/08/2022 1854
11200 25/08/2022 14832
11201 25/08/2022 5562
12145 02/09/2022 2781
12145 02/09/2022 11124
14765 07/10/2022 4944
14765 07/10/2022 14832
14766 07/10/2022 7416
15286 13/10/2022 6180
15286 13/10/2022 18540
15287 13/10/2022 9270
16807 07/11/2022 8343
16807 07/11/2022 16686
16808 07/11/2022 2781
18933 07/12/2022 13905
18933 07/12/2022 8343
19616 19/12/2022 18540
Work Name: ADVANCE PITTING WORK OF 1 M3(1504010/DP/93393042892314221)
21248 10/01/2023 11124
21248 10/01/2023 8343
21249 10/01/2023 2781
Work Name: ADVANCE PITTING WORK OF 1 M3(1504010/DP/93393042892314224)
2529 25/05/2022 21630
2530 25/05/2022 21630
3300 06/06/2022 30900
3301 06/06/2022 30900
3302 06/06/2022 30900
3303 06/06/2022 3090
4402 14/06/2022 21630
4402 14/06/2022 9270
4403 14/06/2022 27810
5538 23/06/2022 21630
5538 23/06/2022 6180
5539 23/06/2022 6180
6723 05/07/2022 5562
6723 05/07/2022 22248
6724 05/07/2022 11124
6724 05/07/2022 2781
7675 12/07/2022 6180
7675 12/07/2022 24720
7676 12/07/2022 12360
8395 23/07/2022 3090
8395 23/07/2022 24720
8396 23/07/2022 21630
8396 23/07/2022 6180
12904 12/09/2022 22248
12904 12/09/2022 5562
12905 12/09/2022 11124
12905 12/09/2022 11124
13731 23/09/2022 22248
13731 23/09/2022 5562
13732 23/09/2022 5562
13732 23/09/2022 8343
14767 07/10/2022 19776
14767 07/10/2022 4944
14768 07/10/2022 2472
14768 07/10/2022 2472
15376 13/10/2022 27810
15376 13/10/2022 3090
15377 13/10/2022 6180
15377 13/10/2022 3090
18934 07/12/2022 5562
18934 07/12/2022 19467
18935 07/12/2022 2781
18935 07/12/2022 8343
Work Name: ADVANCE PITTING WORK OF 1 M3(1504010/DP/93393042892314227)
1868 13/05/2022 12978
1868 13/05/2022 8652
1869 13/05/2022 19467
1869 13/05/2022 2163
1870 13/05/2022 21630
1871 13/05/2022 12978
1871 13/05/2022 8652
2532 25/05/2022 16686
2532 25/05/2022 11124
2533 25/05/2022 25029
2533 25/05/2022 2781
2534 25/05/2022 19467
2535 25/05/2022 13905
2535 25/05/2022 5562
2536 25/05/2022 5562
3304 06/06/2022 15450
3304 06/06/2022 12360
3305 06/06/2022 30900
3306 06/06/2022 18540
3306 06/06/2022 3090
3307 06/06/2022 18540
3307 06/06/2022 9270
3308 06/06/2022 15450
4404 14/06/2022 15450
4404 14/06/2022 12360
4405 14/06/2022 27810
4405 14/06/2022 3090
4406 14/06/2022 21630
4407 14/06/2022 18540
4407 14/06/2022 12360
4408 14/06/2022 3090
5540 23/06/2022 7416
5540 23/06/2022 9270
Work Name: ADVANCE PITTING WORK OF 1 M3(1504010/DP/93393042892314228)
1892 13/05/2022 21630
1893 13/05/2022 21630
1894 13/05/2022 8652
1894 13/05/2022 2163
2537 25/05/2022 27810
2538 25/05/2022 27810
2539 25/05/2022 11124
2539 25/05/2022 2781
3309 06/06/2022 30900
3310 06/06/2022 30900
3311 06/06/2022 12360
3311 06/06/2022 3090
4880 14/06/2022 11124
4881 14/06/2022 18540
4882 14/06/2022 5562
4882 14/06/2022 1854
6614 05/07/2022 30900
6615 05/07/2022 12360
7677 12/07/2022 30900
7678 12/07/2022 27810
8483 23/07/2022 27810
8484 23/07/2022 22248
11114 25/08/2022 21630
11115 25/08/2022 17304
11115 25/08/2022 2163
14769 07/10/2022 24720
Work Name: ADVANCE PITTING WORK OF 1 M3(1504010/DP/93393042892314229)
8397 23/07/2022 12360
8397 23/07/2022 18540
8398 23/07/2022 15450
8398 23/07/2022 15450
8399 23/07/2022 21630
8399 23/07/2022 9270
8400 23/07/2022 9270
8400 23/07/2022 6180
Work Name: ADVANCE PITTING WORK OF 1 M3(1504010/DP/93393042892314230)
5541 23/06/2022 6180
5541 23/06/2022 24720
5542 23/06/2022 18540
6734 05/07/2022 5562
6734 05/07/2022 22248
6735 05/07/2022 16686
8183 12/07/2022 7416
8183 12/07/2022 3708
8184 12/07/2022 1236
8184 12/07/2022 11124
8185 12/07/2022 2472
8401 23/07/2022 21630
8401 23/07/2022 9270
8402 23/07/2022 9270
8402 23/07/2022 21630
8403 23/07/2022 9270
11198 25/08/2022 3708
11198 25/08/2022 14832
11199 25/08/2022 9270
11199 25/08/2022 5562
12906 12/09/2022 11124
12906 12/09/2022 11124
12907 12/09/2022 22248
13725 23/09/2022 9579
13725 23/09/2022 13905
Work Name: ADVANCE PITTING WORK OF 1 M3(1504010/DP/93393042892314231)
3605 06/06/2022 7416
3605 06/06/2022 11124
3606 06/06/2022 1854
3606 06/06/2022 16686
3607 06/06/2022 14832
3607 06/06/2022 1854
3608 06/06/2022 7416
4412 14/06/2022 9270
4412 14/06/2022 21630
4413 14/06/2022 12360
4413 14/06/2022 15450
4414 14/06/2022 27810
4415 14/06/2022 9270
4415 14/06/2022 21630
4416 14/06/2022 3090
4416 14/06/2022 27810
4417 14/06/2022 24720
4417 14/06/2022 3090
4418 14/06/2022 6180
4418 14/06/2022 24720
5543 23/06/2022 21630
5543 23/06/2022 3090
5544 23/06/2022 24720
5545 23/06/2022 15450
5545 23/06/2022 12360
5546 23/06/2022 3090
5546 23/06/2022 24720
5547 23/06/2022 15450
5547 23/06/2022 9270
5548 23/06/2022 12360
5548 23/06/2022 18540
5549 23/06/2022 27810
5549 23/06/2022 3090